• Factory -- The plant area is about 18,500 square meters;
• Lighting -- LED lighting for all factories and office buildings;
• Ground -- BASF wear-resistant aggregate;
• Waste heat recovery -- Workshop utilization system O.P.U.S.X, the first in China;
• Steel structure -- Design, material and construction management provided by Butler Australia, the world's first steel structure company;
• Workshop heating - German radiant heat heating system; Thermal efficiency of 80%, advanced in the world, the first in China;
• Air conditioning system -- the office building uses a combination of ground cooling geothermal system and waste heat recovery system for cooling in summer and heating in winter, without any additional equipment and energy supply;
• Ultra-thick heat preservation and insulation materials and top double layer lighting panel, leading the factory's new energy saving technology.